Measuring What a Completed Agent Task Costs
Per-call price says little about what an AI agent's finished work costs. This note sets out how to measure cost per accepted outcome, counting retries, review, recovery and rejected work, and what remains open.

A model call is only one part of what an AI agent consumes on the way to a finished task. The agent may retrieve records, call external tools, repeat a step that failed, wait for a person to review a draft, and leave behind an ambiguous result that someone has to resolve. A low price per call can coexist with an expensive completed task.
This note treats that gap as a measurement question for agent research. If agents are evaluated on whether their work is accepted, the cost side of an evaluation should be counted against the same unit: the outcome that passes review, not the individual call. The arithmetic is simple. What makes it hard is deciding what counts as an outcome, which attempts belong in the count, and how to treat work that stopped, failed or never resolved.
Why the unit is the accepted outcome
Per-call cost answers a narrow question: what one request to a model costs. Agent tasks are made of many requests, plus tool operations, retries and human effort. Two systems with the same per-call price can differ widely in how many calls, corrections and reviews each accepted result requires.
Measuring per accepted outcome connects cost to quality. Define the outcome, measure the resources consumed while trying to reach it, and divide by the number of results that met the acceptance standard. The figure then describes the same work, under the same quality conditions, that the evaluation is meant to judge.
Fix the task, the acceptance rule and the boundary
Start with a specific task: preparing a reviewed summary from a defined set of sources, reconciling a defined set of records, or producing an answer whose claims are backed by evidence. State what acceptance requires. A draft, a reviewed draft and a delivered result are different units of work, and comparisons are only meaningful between systems measured on the same one.
Then fix a measurement period and include every attempt within it, rejected and unresolved ones included. If a task runs past the end of the period, decide in advance how its costs and eventual result are attributed, and apply that rule consistently. Moving expensive failures outside the boundary improves the figure without changing the work. A change to the acceptance criteria is a change to the measurement, and should be reported as one.
Count everything the work consumed
Model usage is often the easiest component to observe. The rest needs deliberate accounting: retrieval and storage, external tool operations, retries, and the supporting infrastructure, with shared expenses counted once rather than in two places.
Human effort belongs in the count. Review, correction, exception handling and maintenance all take time. Converting that time into cost requires an assumed rate, which is an input to the calculation, not a valuation of anyone's time. One-off setup, such as building integrations or preparing evaluation cases, should be shown separately from ongoing operation.
A hypothetical worked example
Suppose a hypothetical agent that writes evidence-backed summaries is evaluated over one week. It attempts 1,000 summaries, and reviewers accept 850. All figures are illustrative inputs in arbitrary cost units.
| Cost component | Assumed basis | Cost units |
|---|---|---|
| Model processing | All attempts, including repeats | 120 |
| Retrieval and tool operations | Measured operations for this task | 80 |
| Review and correction | 30 hours at an assumed 45 units per hour | 1,350 |
| Operation and maintenance | 5 hours at the same assumed rate | 225 |
| Total ongoing cost | Sum of the four components | 1,775 |
Dividing 1,775 by 850 accepted summaries gives about 2.09 units per accepted outcome. Dividing by all 1,000 attempts gives 1.78 units per attempt. Both are valid measurements; they answer different questions. If one-off setup adds a hypothetical 900 units, the first week totals 2,675, or about 3.15 per accepted summary. That does not describe a typical later week, but it makes the first period's extra expense visible.
Here, model processing is under a tenth of the total. Whether that pattern holds for real agents is an empirical question this note does not answer.
Keep unsuccessful and unresolved work in the count
Retries, rejected drafts and failed tool calls still consume resources. Excluding them understates what it took to produce the accepted outcomes, and recording them as separate categories shows where the cost comes from.
Recovery raises harder counting problems, close to questions our research studies under recovery after partial execution and ambiguous tool outcomes. If a tool call times out and its effect has not been checked, counting the task as complete is premature. If the task is later resumed and its effect verified, the result counts once, not twice because the request was retried. The cost of finding out what actually happened, and of resuming safely, is part of the cost of the outcome.
A task that correctly stops for human approval needs its own rule. A safe stop can be the desired behavior in an evaluation case while producing no accepted deliverable for the denominator. Recording the agent's disposition separately from task completion keeps a correct stop from being scored as an ordinary failure.
Separate cost from waiting and capacity
Cost does not show how long an accepted outcome takes. Elapsed time to acceptance should be measured directly: a summary may need little processing yet sit in a review queue until the next day.
Capacity matters as well. If one reviewer handles every exception, more attempts may produce more waiting rather than more accepted work, so doubling requests should not be assumed to double accepted output at the same unit cost. Waiting time is better reported as a timing measure than turned into a cost figure without an explicit method.
Test the assumptions that move the figure
A sensitivity calculation shows which inputs matter. In the hypothetical week, ten extra review hours add 450 units, raising ongoing cost to 2,225, or about 2.62 per accepted summary. If acceptance falls to 700 while total cost stays at 1,775, the unit cost rises to about 2.54. These are isolated changes; in practice, lower acceptance would likely also change review effort, retries and processing.
When review dominates, a small reduction in model cost may matter less than clearer evidence or fewer correction cycles. Quality and authorization requirements still apply: reducing review by accepting unreliable results changes the task rather than making it cheaper.
Limits of this note
This is a method, not a result. Our working papers do not report cost studies, and the figures above are hypothetical. Any calculation of this kind depends on the task definition, acceptance rule, boundary and assumed rates, so it should be published with those inputs: task, period, attempt and acceptance counts, units, included and excluded costs, and assumptions about human effort.
Questions that remain open
Should agent evaluations report cost per accepted outcome alongside success rates, and how should benchmarks define acceptance so the figure is comparable across studies? How should a safe stop or an escalation be counted when it consumes resources but yields no deliverable? How should the cost of verifying an ambiguous tool outcome, or of resuming after partial execution, be attributed? And how can review effort be measured per task, rather than estimated in aggregate, without changing the review itself?